Muzaffarnagar
Waste to Energy
Processing 1500-2500 tons of waste a day - Saving up to 336.640 tons of CO² - Output of at least 29 MW an hour and many recyclables
To be constructed
Landfill
Collection Platform
Digester/ Water treatment/ Power Generator
Separator
Storage Hall
Incinerator
Concrete Lego block Factory
Offices
Clearing the landfill
The current use of the plot is a recycle plant. The recycleplant is overvfilled with municipal solid waste (MSW). During the constructing and operating phases the landfill will be cleared in stages
Collection Platform
Fresh (MSW) will be brought to the facility by the municipality. On arrival collected waste will be weighted and deposited at a central deposit point. Afterwards the waste will be dryed and possibily seaved before the next step.
Digester/ Water Treatment Plant / Power Generator
Organic waste is processed in the digester into electricity for the plant and digestate for the Incinerator. The installation also cleans all wastewater from the plant.
Separator and Storage Hall
Waste from the collection platform is put into a separation installation to filter recyclables from waste with a high caloric value (RDF). Separated waste can be stored if necessary
We sell recyclables such as metals to local companies who can reuse it in their company process.
Incinerator
The incinerator is the core of the ‘Waste to Energy’ plant. RDF burns to generate electricity. The incinerator will be constructed to Dutch/EU standards.
Concrete Lego block factory
Construction waste can be crushed and blended with sand and cement to create concrete. This will subsequently be used to make concrete blocks (or other concrete objects that are demanded locally).
When the incinerator is up and running, fly ash can also be used in the concrete mix.
Offices
To foresee in enough workplace for all required employees a suitable office is constructed at the plant for during the operations.